Ordering a Sequence of Archwires
After approving the setup, many SureSmile doctors order two or three
initial wire pairs with the same prescription but different cross-section
to more comfortably move patients into SureSmile treatment. For example;
a doctor may start with 16 x 22 NiTi, and then change to 17 x 25. Since
it can be time-consuming to enter wire orders individually, the wire sequencing
feature allows you to set up some default sequences and then choose from
these sequences when it is time to order wires for a patient.
Pre-define your wire sequences
Since many practices use the
same sequence of wires for most patients, SureSmile allows you to pre-define
your wire sequences under preferences. Go
to your Preferences
page
and click the Wires
tab.
The wire sequences section is visible and editable by all user types.
SureSmile includes a default labial and default lingual wire sequence.
You cannot edit the default wire sequences, but you can copy a default
wire sequence, rename it and then edit it to create your own wire sequence.
Alternately, click the New
Wire Sequence button
to create a completely new wire sequence. For
detailed instructions, go to Define
Wire Sequences.
Order a sequence of wires
As you order wires for each patient, you can apply one of the SureSmile
default wire sequences, or you can apply one of your own wire sequences.
- Start a wire order using one of the following methods:
- From the New menu,
select Wire.
or
- Create a wire copy. (see Copy
a Wire Order.)
or
- Select the Create Wire Order
Next option after you approve the setup.
The Create
New Wire window opens.
- (Optional) If you want to change the plan which the wires will
be based on, select from the list.
- (Optional) Copy overrides from previously ordered wires to the
upper and lower arches.
- Click Apply Wire
Sequence. The Wire
Sequence window opens with the default pre-defined wire
sequence displayed.
- Click the Select Wire Sequence
drop-down and choose the appropriate pre-defined wire sequence for
this patient.
NOTE: If the patient
has a combination lingual/labial treatment and you select a wire sequence
that has labial or lingual wires for both arches, a new warning will be
displayed: Warning: Labial/Lingual conflict.
- Make any necessary changes to the wire sequence for this patient.
After you are finished reviewing and editing the wire sequence per
the procedures detailed in the Wire
Sequence Tab topic, you are ready to submit the order. When finished,
click Apply Sequence.
Result:
It takes about the same time to generate the wire sequence as it does
to generate a single wire order. When the wire sequence finishes generating,
the name of the sequence appears in the links (bread crumbs) at the top
of the window. The sequence of wires is shown at the top of the Wire Sequence tab to the right of
Select Model:. The cross-section
and wire materials options are not available on the Order tab for a wire
sequence. Instead, to make any changes to wire materials or cross-sections,
you must use the Wire Sequence tab.
- (Optional) To make changes to particular wires in a sequence,
for example to select a different cross-section or add over-corrections,
go to the Wire Sequence tab
and select the Single Wire
or Multi-Wire option.
- Single
Wire - Similar view to the Wire tab for a single wire.
Allows you to make all movements to a single wire.
- Multi-Wire
- Allows you to view values for a single movement type for all
of the wires in a sequence.
Tips for making changes on the Wire Sequence
tab:
- To display a particular wire in the sequence, select the corresponding
small numbered tab to the right of Select
Model:
- Select the Upper or
Lower option to select
the wire material and cross-section for each arch.
- Enter the values in the table as needed for each arch.
Result: The archwire on
the model on the right side of the screen will reflect the values
you entered.
- (Optional) Click in the Order
Name box and rename the archwire order to indicate the
changes just made (e.g., Wire2 - RCOS/EXP/TORQUE].
- (Optional) To rename the individual wires in a wire sequence,
go to the Wire Sequence tab and click the small tab for the individual
wire. Highlight the old name in the Order Name box and type the
new name over it. Click out of the Order Name box and the new
name is shown on the tab for the individual wire. Click
OK to save the new name.
See the Wire
Sequence Tab topic for more details.
- To order your wire sequence, select the Order
tab. and click the Submit Wire Sequence
button.
Result:
The sequence splits into individual wire orders. Notice the wire names
appear in the product drop-down list and in the timeline. (Prior to being
submitted, the Wire sequence is shown in the timeline as one element,
but after the order is submitted, the wires are listed individually.)
NOTE: If you try
to order a wire that is potentially unbendable by the SureSmile robots,
the following message appears on the Submit
Wire dialog box: "Note: the
Robots may not be able to bend the [upper/lower] wire. The Digital Lab
will contact you if adjustments are required."
Wire Sequence order naming conventions
Wire
sequence orders follow this naming convention:
<name
of setup/simulation wire is based on><name of wire in sequence>
<limit % (if not 100%)><patient's initials>
For example: WS
1 Wire 1 - 60% AW
TIP: If you start a wire order without
choosing the sequence option, but then decide to order a sequence of wires
instead, just click the Wire Sequence
button on the Order tab before
you order the wire.
Copy changes to subsequent wires in a sequence
If you make wire design changes such as entering overrides or adding
Curve of Spee, you can copy these changes to subsequent wires in the sequence.
- From the Wire Sequence
tab, enter your wire design changes in the earliest wire applicable
in the sequence.
- Click Update Next Wires.
Result: The changes are copied
to all subsequence wires in the sequence.
Add a wire to a sequence in single wire view
- From the Wire Sequence
tab, select the Upper or Lower arch.
- Select the Single Wire
view. Click the small tab for the wire you want to duplicate.
- Click Add Wire. A new wire
appears in the sequence preceding the selected wire.
- If you wish to modify the new wire, see Order
a sequence of wires with overrides.
Add a wire to a sequence in multi-wire view
- From the Wire Sequence
tab, select the Upper or Lower arch.
- Select the Multi-Wire view.
Click in any cell in the table row to highlight the row for the wire
you want to duplicate.
- Click Add Wire. A new row
for the new wire appears in the table above the selected wire.
- If you wish to modify the new wire, see Order
a sequence of wires with overrides.
Remove a wire from a sequence in single-wire view
- From the Wire Sequence
tab, select the Upper or Lower arch.
- Select the Single Wire
view. Click the small tab for the wire you want to remove.
- Click Remove Wire.
Note:
When you display the last wire in a sequence, the Remove Wire button is
dimmed and cannot be clicked.
Remove a wire from a sequence in multi-wire view
- From the Wire Sequence
tab, select the Upper or Lower arch.
- Select the Multi-Wire view.
Click in any cell in the table row to highlight the row for the wire
you want to remove.
- Click Remove Wire.
Note:
You cannot remove the last wire in a wire sequence, as this wire represents
the target or "setup" of the sequence. Tor remove a wire sequence
completely, go to the Order tab
and click the Remove Wire button.